Category Archives: Projects

First QSOs with K1

I finally had some time to hook the K1 up to a real antenna.  I gave 30 meters a whirl because that was where there was some transmit issues due to the wrong supplied toroid size, as well as the … Continue reading

Posted in Projects, QRP | Leave a comment

K1: All But Final 2 Toroids

Two hours and 5 minutes later, and the final transmitter components, with the exception of T3 and T4 have been installed.  Total time is now  24.25 hours.  It’s going to take an hour to wind those two remaining toroidal transformers, … Continue reading

Posted in Gear, Projects, QRP | Leave a comment

RX Alignment Completed

I completed the VFO work and all the RX alignment steps (calibration, filter alignment) in 50 minutes.  All the tests and alignment steps went quite well. The only problem I hear is obviously internal (hear it with antenna disconnected and … Continue reading

Posted in From the OM, Projects, QRP | Leave a comment

K1 RX Assembly & Tests Completed

I spent 50 minutes installing mostly mechanical components to enable the initial K1 tests. In this final RX assembly part, a coax jumper was a major pain simply because it was short yet had to be lead formed to fit … Continue reading

Posted in Projects, QRP | Leave a comment

K1 Assembly: Three Toroids Mounted

Winding the toroids takes a bit of time, not so much the simple inductors, as the transformers with multiple windings. Today I completed L2, T1 and T2 and mounted them.  It took 65 minutes to deal with the 8 parts … Continue reading

Posted in Projects, QRP | Leave a comment

K1 Passes Voltage Tests

Assembly of the K1 RF Board continues.  Today, I added 49 more components in 115 minutes.  This means the RF Board assembly time so far is 7.5 hours after 193 components, and the total K1 assembly time now stands at 19.5 hours.  There are … Continue reading

Posted in Gear, Projects, QRP | Leave a comment

K1 Assembly Burp #3

I spent 65 minutes fabricating three SMT replacement for a SA612AN chip that is no longer available in through-hole.  The process involved in stripping 24 1″ wires, somehow holding them in place while soldering them to an adapter that is … Continue reading

Posted in Gear, Projects, QRP | Leave a comment

K1 Assembly Continuing

The K1 RF Board assembly continues to move forward.  Today, 24 components were installed in 70 minutes.  Only a third of the RF board remains, with a bit under 16 hours spent so far.

Posted in Gear, Projects, QRP | Leave a comment

K1 RF Assembly Continuing

After 2 hours 20 minutes of assembly time, there are 81 components on the RF board (a rate of about 1.75 minutes a component).  With 251 total components on the RF board, I’m about a third of the way away. … Continue reading

Posted in Gear, Projects, QRP | Leave a comment

K1 RF Board Assembly Underway

It’s been about 5 days since I did any work on the K1.  This time of year it’s important to keep the family happy, and that means lots and lots of Christmas decorations.  I hate the thought of landfilling the … Continue reading

Posted in From the OM, Gear, Projects | Leave a comment