K1 Filter Board Completed

I’d say this is about 1/6 of the work (2/6 for the Front Panel, and 3/6 for the RF board remaining).  It took a total of 255 minutes to complete the installation of 64 component, or about 4 minutes per part (that would put the total assembly time for the K1 at about 25 hours).  That includes all of the final assembly tests (resistance, shorts, opens, correct placement, etc.) as well as quite a bit of time spent with the toroids (especially the incorrect diameter parts).

K1 FB Done

This entry was posted in From the OM, Gear, Projects. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *