Category Archives: From the OM

A Grand Day at ARRL HQ

A friend of mine, Paul, N1PSX, and I drove to ARRL HQ yesterday for a visit.  It was Paul’s first trip, and the first time in a long time for me (my father and I visited in 1982 when we … Continue reading →

Posted in From the OM, Gear, History | Leave a comment

Honored to have contacted VP8STI

What an amazing DXpedition to two islands off the coast of Antarctica, South Sandwich, and South Georgia.  Despite the fact that it is summer there, it’s still one of the most inhospitable areas on the planet.  Case in point, from … Continue reading →

Posted in DX, From the OM | Leave a comment

Goodbye Solar Cycle 24

Goodbye Solar Cycle 24, you were fun while you lasted! Propagation is really impacting the K5P (Palmyra Island), VP8STI (South Sandwich Island), and VP8SGI (South Georgia Island), DXpeditions. I note that solar levels appear to be somewhat higher than when I … Continue reading →

Posted in From the OM, Operating, Propagation | Leave a comment

K1 Assembly Complete

I completed and installed the two coils in 50 minutes.  I then spent another 40 minutes doing the TX tests and alignment.  That brings the total time to 25.75 hours. The initial transmitter testing went well, with coils almost peaked … Continue reading →

Posted in From the OM, Propagation, QRP | Leave a comment

Goals for 2016 and 2015 in Review

I completed almost all my 2015 goals. Complete DXCC Challenge with 1000+ points YES (1136) Complete 30m and 12m DXCC (7BDXCC) (80m seems unlikely) Yes – Bonus did 80 too Complete 12m WAS (7BWAS) (a stretch to get DE and … Continue reading →

Posted in From the OM | Leave a comment

Quad Hands — Helpful Holding Device

I’ve used a rather inexpensive “Helping Hand” source from China to help hold parts while I solder them.  That tool is a pain to use and not very effective.  So I’ve been looking for a replacement.  I ran across something … Continue reading →

Posted in From the OM | Leave a comment

RX Alignment Completed

I completed the VFO work and all the RX alignment steps (calibration, filter alignment) in 50 minutes.  All the tests and alignment steps went quite well. The only problem I hear is obviously internal (hear it with antenna disconnected and … Continue reading →

Posted in From the OM, Projects, QRP | Leave a comment

Another Surprise From the ARRL

I guess the January 2016 QST is hot off the press.  I received an express envelope with three pristine copies today as a courtesy for a brief piece in Technical Correspondence [pages 72 & 73]. My father was a journalist, … Continue reading →

Posted in From the OM, Gear, History | 1 Comment

K1 Assembly Burp #2

I had a chance to install a dozen components today, but it took about 50 minutes.  This was because the two adjustable caps (C13 & C20) as supplied do not match the manual description or silkscreen outline.  Elecraft specifies a particular … Continue reading →

Posted in From the OM, Gear, QRP | Leave a comment

K1 RF Board Assembly Underway

It’s been about 5 days since I did any work on the K1.  This time of year it’s important to keep the family happy, and that means lots and lots of Christmas decorations.  I hate the thought of landfilling the … Continue reading →

Posted in From the OM, Gear, Projects | Leave a comment